Network Administration/System Administration Training

This is an unofficial course designed to train the students in the Department of Computer Science and Information Engineering to become part of the technical team to perform daily network and system maintenance tasks.

News

  • 8/24 - SA二階名單公布!
  • 8/19 - NA二階名單公布!二階名單按這
  • 7/02 - HW 5~7 solutions released!
  • 7/01 - All grades except final report released!
    CEIBA成績
  • 6/15 - 每組將有十分鐘報告時間,請規劃好要呈現的內容及demo配置
    十分鐘結束後,將有五分鐘Q&A時間讓台下助教、老師及同學發問
    整體期末project分數將為 書面report(50%)+上台報告(老師助教評分(30%)+別組評(10%)+組內互評(10%))
    書面report請於6/24(Fri.)前上傳至SFTP,一組交一份即可
    檔名請用 final_report_<組別>.pdf (ex. final_report_NA8-1.pdf)
  • 6/02 - 期末project分組 & 報告順序,有任何錯誤請通知助教
  • 5/27 - HW7 released!
  • 5/24 - 期末project分組,組別就是各組分配到的題目,有任何錯誤請通知助教
  • 5/20 - Final Project Topics released!!!
    請在5/23 Mon. 17:00前填分組表單,詳細說明請看表單內說明或是助教的信
    目前SA mentors資訊還未補齊,之後會更新:)
  • 5/18 - HW6 released!
  • 5/13 - HW 1~4 and midterm solutions released!
  • 5/09 - HW 1~4 及期中考的成績公布,請看ceiba成績
  • 4/20 - HW5 released!
  • 4/06 - HW4 released!
  • 4/02 - HW3 instruction updated!
  • 3/29 - 台達電機房參訪,時間訂在 5/5 Thu. 09:00~12:00,請在 4/8 Fri. 12:00 前出席調查
    無法參訪的同學也要記得填寫調查並說明請假原因,沒有填寫調查也沒有出席的同學會視為一次缺席
  • 3/28 - HW3 NA2 has updated! 請填寫demo時段
  • 3/23 - 期中考分組名單,有任何錯誤請通知助教
  • 3/23 - HW3 released!
  • 3/09 - 期中考分組,請在3/23 Wed. 17:00前填完
    小組成員需共同完成期中考上機考,截止時沒有分組的同學將由助教隨機分組
  • 3/09 - HW2 released!
  • 3/04 - 已申請好所有外系同學的工作站帳號及門禁
  • 3/03 - HW0 solution has released!
  • 3/03 - 修課名單確認,有任何錯誤或不在名單上的請通知助教
  • 3/01 - HW1 released!
  • 2/24 - HW0 & 報名表deadline延至3/2 Wed. 17:00
  • 2/24 - 欲修課的同學請務必完成報名表 && HW0 && 第一周上課出席
  • 1/26 - HW0上傳位址 ftp://mvnl.csie.ntu.edu.tw:2016 anonymous user
    檔名請用 HW0_[學號]_[version].zip (ex.HW0_bxx902xxx_ver1.zip)
  • 1/25 - HW0 released!

Course Information

  • Class time: Wednesday 18:30-21:30
  • Classroom: CSIE Building 204
  • 統一的問題或公告會PO在PTT2 HsinMu
  • Teaching Assistant:
    • Network: Shao-Chuan Lee, Yu-Wei Huang, Szu-Chieh Wang, Zi-Jie Lin, Nicky Chao
    • System: Ting-Wei Lan, Tian-Yi Lin, Jin-Jie Huang, Ju-Chien Cheng
    • Administrator: Chiao Fu, Jia-Yun Jiang

Please direct all your questions to vegetable@csie.ntu.edu.tw and the e-mails will be forwarded to all members of the teaching team.

TA Hour

HomeworkPartTATA Hour
HW1NAYu-Wei Huang3/08 Tue. 19:00 ~ 21:00 @ 204
SATian-Yi Lin3/04 Fri. 16:00 ~ 18:00 @ 204
HW2NAZi-Jie Lin3/15 Tue. 11:20 ~ 13:10 @ 217
SAJin-Jie Huang3/18 Fri. 14:20 ~ 16:20 @ 217
HW3NA1Shao-Chuan Lee4/06 Wed. 14:00 ~ 17:00 @ 217
NA2Nicky Chao see the demo time below
HW4SAJu-Chien Cheng 4/18 Mon. 18:30 ~ 20:30 @ 204
NAYu-Wei Huang 4/15 Fri. 16:00 ~ 18:00 @ 204
HW5SA1Jin-Jie Huang 4/29 Fri. 15:00 ~ 17:00 @ 217
SA2Ting-Wei Lan5/06 Fri. 15:00 ~ 17:00 @ 217
HW6NA1Nicky Chao 5/16 Mon. 20:00 ~ 22:00 @ 204
NA2Szu-Chieh Wang 5/19 Thu. 20:00 ~ 22:00 @ 地下室水族箱前沙發
HW7SA1Ju-Chien Cheng 6/13 Mon. 19:00 ~ 21:00 @ 204
SA2Ting-Wei Lan 6/14 Thu. 15:00 ~ 17:00 @ 217

Grading

  • assignment x 7 (35%)
  • midterm exam (25%)
  • final project (25%)
  • class participation (15%)

Class Schedule & Lecture Notes

Date Events Lecture Notes
02/24 HW1 announce
03/02
03/09 HW2 announce
03/16
  • Partitioning, LVM, filesystem, software RAID
03/23 HW3 announce
03/30
04/06 HW4 announce
04/13
04/20 Midterm

Midterm Exam(18:30 ~ 21:30) 小組上機測試 @ R204
請準時到考試現場。可以帶任何參考資料或是筆電當場查詢資料。
midterm midterm_sol

04/27 HW5 announce
05/04
  • System configuration, log (how to setup network interfaces, configure their ip address, debug with system logs)
05/11
05/18 HW6 announce
05/25 HW7 announce
06/01
06/08
  • Experience sharing
06/15 Final Final Project Presentation_NA
06/22 Final Final Project Presentation_SA

Homeworks

Homework Due Problems File Solution
HW0 2/26

HW0

HW1 3/09

HW1

HW2 3/23

HW2

HW3-NA1 4/06

HW3

hw3.pka
HW3-NA2 4/13

Demo時段
demo時間登記
4/06 Wed. 15:00 ~ 19:00 @ R219
4/07 Thu. 20:00 ~ 22:00 @ R204
4/08 Fri. 16:00 ~ 18:30, 19:00 ~ 22:00 @ R204
4/09 ~ 4/12 Sat. ~ Tue. 19:00 ~ 22:00 @ R204
4/13 Wed. 14:30 ~ 17:00 @ R204
另外約時間,b02902055@ntu.edu.tw
來的時候先把機器開好,方便測試是否符合spec

HW4 4/20

HW4

dig.sh
HW5 5/18 HW5 HW5_sol
HW6 6/01 HW6
HW7 6/15 HW7 HW7_sol
Final Project
Report
6/24 comments
 
nasa_16spring.txt · Last modified: 2017/03/28 21:01 by vickylin · [Old revisions]
Recent changes RSS feed Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki